2025 THOR TRAILER THR-3-LPG-60-ST

    EUR € 34.000 
    Trailer Location:Uluirmak Sk.Ankara, Turkey 06800(Opens in a new tab)

    Seller Information

    View Seller Information

    AGATHOR OTOMOTIV MADENCILIK DIS TICARET LIMITED SIRKETI

    Contact:Hakan Genis

    Phone:+90 532 356 82 73

    Ankara, Turkey 06800

    +90 532 356 82 73

    WhatsApp(Opens in a new tab)
    Hide Thumbnails

    Description

    60 m3 LPG TANK SEMITRAILER Chassis : Half chassis made of 6252 Steel quality . Strong and Heavy Duty type. Axles : 3 x Turkish Axles , German Tüv Approved with 14 tons capacity each. Brakes : Drum Brakes Suspension : Steel Suspension Brake System : Two line brake system with WABCO ABS according to European Norms, Automatic Slack Adjusters Landing Legs : 24 tons each according to the European Norms Kingpin : 2 ‘’ changeable to 3,5 ‘’ according European Standards. King Pin Plate thickness 12 mm Tyres : 12 + 1 385/R22.5 Bridgestone with Steel Rims Electrical System : 24 V according to European Norms. ( ADR stop lights, 5 Lights on each side ) Complete Reflectors and Signs 3M Brand , Wheel chocks, 2 x Fire Extuinguisher ADR , 2 Units Food Box, Sunshade on the Tank Accessoires : Water Tank , Spare wheel carrier Project Code : AD2000 Code-PED97/23/EC Design Temperature : Min -20 C / max. +50 C Design Pressure : 17,16 bar Test Pressure : 26,50 bar Tank Material : P355 GH Head Type : Elipsoidal External Tank Diameter : 2.400 mm Wall Thickness : 10 mm Equipments on Tank : -2 inch Safety Relief Valve : REGO 7534G ( 2 Units ) -Rotogauge – Rotary Level Indicator ) : REGO ( 1 Unit ) -¾ inch excess Flow Valve for Manometer ( 1 Unit ) -Thermometer (-30/60 C ) : Pakkens ( 1 Unit) -Manometer ( 0-25 bar ) : Pakkens ( 1 Unit ) -Hydraulic Operator ( 1 Unit ) -2 inch Hydraulic Valve ( 2 Units ) -3 inch Hydraulic Valve ( 1 Unit ) -2 inch Ball Valves : Batu ( 3 Units ) -2 inch Filler Flanges : M60x4 ( 3 Units ) -ACME Filler Cap : ( 3 Units ) -Filter : Batu ( 1 Unit ) -16 inch Manhole ( 1 Set ) -Earthing Bar : ( 1 Set ) Paintwork and Sandblasting : -During painting works of the external tank surface , it will be cleaned properly from any burr, hollow ,oil and dirt. -Following the cleaning works, sanding will be applied to obtain surface appearance of SA 2 ½ quality. -Roughness Value of the Surface will be 50 – 70 Rz -As First coat will be applied epoxy paint base with surface tolerance and dry film thickness of 180 micron -As the second coat , arcylic polyurethane top layer with high resistance with a dry film thickness of 70 micron -Final Coat color of the Tank will be white ( RAL 9010 ) -Total Paint Thickness will be 250 microns Radiographic Tests : -Welding Seams of the tank will be subject to radiographic control by 100 % longtidunal values . -Radiographic images will comply with the EN 1435 standard. -The Relevant staff will be certified according to EN473. -Radiographic examinations will be made through high-sensitive , panoramic and linear X-Ray devices. -These controls will be executed by certified staff Penetration Test or Magnetic Particle Test : -Nozzle _Body and Manhole – Body Welds will be controlled through penetration or magnetic particle test method by 100% Hydro static Test : -Following the construction , the tanks will be subject to hydro static test as per the design rules and standards. -During hydrostatic Test , clean and fresh water will be Liquid which may react to the tank materials will be used for hydro static test. -In case the water and ambient temperature is below 15 C, the hydrostatic test will be not performed -The Hydro static test will be accompanied by the independent certification body TURK LYOD . -Following the hydro static test, inside and all internal Pipes of the Tank will be dehydrated. -Inside of the Gas will be purged with gaseous nitrogen. Certification : -The tank will hold a branding / ‘’ Inspection Report and Certificate’’ issued by an international independent auditcompany ( Turk Lyod ) according to the European directive. -Quality Plan and F Module Certificate -Inspection Report and Certificate -Quality Plan -Sheet Orientation , Material List, Material Certificates -Material Orientation Plan -Material List -Sheet , pipe and flange certificates -Certificates of the welding materials -Welding Method Instructions ( WPS ) -Welding Method Tests ( PQR ) -Welder Certificates and Welding Plan -Plain seaming of the Body Sheet ( WPS ) -Circumferential welds of the Body ( WPS ) -Nozzle – Body – Manhole Weldings ( WPS) -Pipe – Pipe,Pipe-Flange Weldings ( WPS ) -PQR -Welder certificates -Welding plan -Dished Heads Reports, Head Treatment Graph and Report -Dished Heads control report -Dished Heads magnetic test report -Heat treatment graph and report -Welding Test reports of the Construction -Longitudinal welding seams -Circumferential welding seams -Non-destructive test reports -Eye and measure control report -Dye penetrate test reports -Radiography reports -Hydrostatic Test Report -Name Plate , Fixture Certificates -Carbon copy of name plate -Carbon Copy of the 3 rd party embossed stamp Baffles : -Tank will have three Units of Anti-Slosh baffles

    Specifications

    Year2025
    ManufacturerTHOR TRAILER
    ConditionNew
    Compartments1
    Capacity32 000 L
    Year2025|
    ManufacturerTHOR TRAILER|
    ConditionNew|
    Compartments1|
    Capacity32 000 L|
    Show As Paragraph

    Your current browser cannot run our content, please make sure your browser is fully updated or try one of the browsers below.

    Your browser is not supported

    Microsoft Edge

    Google Chrome

    Mozilla Firefox